Underwater maintenance works in the Gepatsch reservoir

As a result of sedimentation problems in the Gepatsch reservoir, a special structure was created to enable inspection and maintenance work to be carried out in the headrace and bottom outlet tunnels upstream of their locking devices, without the need to draw down the reservoir. Steel guide frames with sliding stoplogs were installed in front of the bottom outlet intake structure and the lower headrace intake at a depth of about 110 m by divers, using a saturation system. Innovative design features of this project are described here.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£10.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

Underwater maintenance works in the Gepatsch reservoir

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close