The ‘scheme freeze’ design stage in small hydropower: How to avoid a design thaw

This paper provides recent feedback from several small hydropower projects in the range of 5 to 25 MW at which, through the introduction of a rather unique step to the early stage design process, a series of successful outcomes have been achieved in delivering those projects by the engineering-procurement-construction (EPC) type of contract.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£10.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

The ‘scheme freeze’ design stage in small hydropower: How to avoid a design thaw

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close