The impact of insufficient hydropower plant safety: A case study

This article highlights the example of a hydropower plant where insufficient due diligence during the implementation of a construction project led to serious damage, both to the hydropower plant itself and to the land affected by it. In particular, the paper emphasizes the discrepancies between the permit application design and the actual hydropower plant and pressure pipe that were constructed.