The design of the Alzir dos Santos Antunes hydro plant, Brazil

The Alzir dos Santos Antunes (Monjolinho) hydro plant, on the Passo Fundo river in southern Brazil, with total capacity of 74 MW and 45.1 MW of assured energy, went ahead for construction in September 2007 and began commercial operation in September 2009.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£10.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

The design of the Alzir dos Santos Antunes hydro plant, Brazil

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close