Integrated BIM design for the construction phase at the Limberg III pumped-storage plant in Austria

The Limberg III pumped-storage plant in Kaprun, Austria, represents a significant advancement in renewable energy infrastructure. As the demand for sustainable energy solutions increases, projects like Limberg III play a crucial role in balancing energy supply and demand. This paper aims to explore the innovative use of Building Information Modelling (BIM) in the construction phase of this project. The approach is distinguished by the integration of multiple discipline models into a cohesive and efficient design process, showcasing the originality of this research and development.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£15.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

Integrated BIM design for the construction phase at the Limberg III pumped-storage plant in Austria

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close