Innovative engineering benefits fish at Kostheim

Upstream and downstream fish passage has been assured at the Kostheim low-head hydro scheme under construction in Germany. The design concept is described here, as well as measures to monitor the performance of the system.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£10.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

Innovative engineering benefits fish at Kostheim

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close