FMHL+: Power extension of the existing Hongrin-Léman powerplant

A major upgrade is currently underway at the Hongrin-Léman pumped-storage scheme, near Montreux, Switzerland, to double the present capacity of 240 MW. This paper outlines the development of the studies for the project, describing some of the major challenges. Details are discussed of the machinery arrangement and transient analysis relating to the existing scheme, as well as on-going commissioning and finishing works.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£10.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

FMHL+: Power extension of the existing Hongrin-Léman powerplant

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close