Cyclic fatigue in unlined hydro tunnels caused by pressure transients

Regulated hydropower is currently the most capable load balancing technology for the future renewable energy system which will be characterized by a large share of unregulated energy from solar and wind power. Increased application of hydropower for balancing means that more frequent pressure transients will occur in the waterway system. In this article, the authors explain how such pressure transients cause pore pressure fluctuations in the rock mass surrounding the tunnel periphery and may lead to cyclic fatigue. An explanation of the mechanisms that contribute to fatigue is also presented along with the most significant factors that can accelerate the fatiguedevelopment. The possible applications and limitations of these findings are discussed and recommendations are given.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£10.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

Cyclic fatigue in unlined hydro tunnels caused by pressure transients

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close