Study for a low head energy site at Sawer dam, Canada

The Bawitik Power Corporation sought to develop a generating station at Sawer Creek dam on the Otonabee river near the town of Lakefield, in Ontario, Canada. With 3.2 m of head, the developers concluded that the challenge would be economic rather than technical, and a phased development process was used that optimizes both. The technical solution was developed using a set based design approach, and extensive turbine market soundings. This was coordinated with an early contractor involvement approach allowing the design and construction methods to be optimized, along with costs that are not driven by the design choices.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£10.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

Study for a low head energy site at Sawer dam, Canada

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close