Design and construction of the Çambaşı unlined headrace tunnel

This paper presents the background for the construction of an unlined headrace tunnel at the Çambaşı project in Turkey. The analysis and design process included a study of the rock mass characteristics, evaluation of possible leakage, and an estimation of the grouting requirements to control any leakage from the tunnel.

Back to search

Order the full article

Get a copy of this back issue article in digital PDF format

£10.00
Buy Now

Print Journal

Go in-depth with the international journal on hydropower & dams

Learn more

Design and construction of the Çambaşı unlined headrace tunnel

All your interactions with our website are protected by strong 256-bit encryption. Learn more about how we safeguard your personal data in our Privacy Policy.

Close
Close