Lot 1 will require the retrofit of two out of three of the turbines and optionally the third one, the replacement of the oil governor and implementation of digital governor, the supply and installation of a turbine control and protection system including the local Human-Machine Interface (HMI) as well as a low voltage cabinet for the turbines auxiliaries and the supply of the associated mechanical and electrical auxiliaries, accessories, and instrumentation. Lot 2 covers the lifetime extension works of two out of three of the generators and optionally the third one, the retrofit of the excitation system as well as each of the generator’s control and protection system including local HMI and the supply of the associated mechanical and electrical auxiliaries, accessories and instrumentation.
Luminus, which is majority-owned by EDF, is the second largest electricity producer and supplier on the Belgian energy market. It owns and operates seven hydropower plants totalling 67 MW
The tender notice can be viewed on the EU’s procurement website TED at:
https://ted.europa.eu/udl?uri=TED:NOTICE:328111-2022:TEXT:EN:HTML&src=0
The procurement documents are available for unrestricted and full direct access, free of charge, at: www.luminus.be. Tenders or requests to participate for the contracted works (Reference number: LUMINUS – CHR HPP RETROFIT – 2023-2024) must be submitted to the below-mentioned address. Additional information can be obtained from Nicolas Bègue, Luminus, Koning Albert-II laan, 7, Brussels 1210, Belgium; E-mail: Nicolas.Begue.Ext@luminus.be; www.luminus.be.